Inside an AWS review

See what you receive before you book.

A useful review explains what to change, why it matters and what to check first. This example follows a small AWS application through cost, access and recovery findings.

A clear picture of one workload

Your review starts with an architecture overview and resource list. Each finding names the evidence, likely impact, recommended next step and the person who needs to approve it.

In this example, a load balancer sends traffic to three EC2 application instances. They use a database and write logs to CloudWatch. The review considers a smaller instance size, deployment access and how the team would recover its data.

01 · Cost

Test a smaller EC2 size while keeping three instances.

What the usage suggests
Consider three instances with 4 vCPUs and 8 GiB of memory each. Over 28 representative days, the highest five-minute CPU reading is 30% and memory usage reaches 2.5 GiB per instance. A size with 2 vCPUs and 4 GiB of memory is worth testing. Check whether those readings include traffic peaks and background jobs.
What we recommend
Test the smaller size with the same application and representative traffic. Keep three instances. Confirm that the remaining instances can handle traffic when one is unavailable, and check response times, errors, memory, network and disk limits.
Compute cost calculation using example hourly rates
ConfigurationMonthly cost
Current size3 × 730 hours × US$0.20US$438.00
Smaller size3 × 730 hours × US$0.12US$262.80
Potential differenceUS$175.20

The example rates explain the calculation. Your estimate uses the region, instance type and the rates you actually pay. Existing Savings Plans or reservations can change the saving. Storage, data transfer, support, tax and testing costs are additional.

Who approves the change
The workload owner agrees performance limits and the rollout plan. Keep the previous configuration ready. If the smaller size fails the agreed checks, retain the current size.
How to measure the result
After an approved change, compare billed cost and workload volume across representative periods. Check whether costs moved to another service, and confirm that response times and errors remain within the agreed limits.

Cost is only part of the review.

Findings also identify decisions that need more information. Here is how access and recovery questions could appear in the same review.

02 · Access

Narrow the deployment role’s permissions.

If a deployment role can change more resources than its pipeline needs, the finding lists those permissions and the release steps that use them.

The next step is to propose a narrower policy and test it in staging. The application owner confirms that deployment and rollback still work before approving a production change.

03 · Recovery

Check that backups can support recovery.

A backup schedule does not show how long a restore takes. If no recent restore record is available, the review identifies the missing check and the data-loss and recovery-time limits the team needs to agree.

The next step is a separately planned restore exercise in an isolated environment. Record the restored data, access checks and recovery time before relying on the procedure.

Leave with a practical order of work.

  1. 1. Confirm the starting point. Confirm traffic peaks, billing rates, deployment permissions and recovery requirements.
  2. 2. Choose the checks and who will run them. Decide who approves each change, how success is measured and when to stop or roll back.
  3. 3. Plan implementation. Your engineers can carry out the changes, or we can agree a separate delivery scope.

We walk through the architecture, resource inventory and prioritized findings with your team. You can ask questions and agree the next steps.